What needs to be true before you start an application control project
Application control projects do not fail because the technology is hard. They fail because the environment was not ready for the control before it was introduced.
Empowering Microsoft WDAC
WDACManager Blog
Practical guidance on WDAC, Intune ACfB, Application Abstraction, policy lifecycle design, and controlled enterprise rollout.
13 posts in WDAC
This archive supports navigation and internal linking.
Application control projects do not fail because the technology is hard. They fail because the environment was not ready for the control before it was introduced.
Application control rollouts rarely stall because of the business. They stall inside IT, and each internal group resists for different reasons.
Managed installer is the shortcut every struggling WDAC project reaches for. It papers over the work that actually matters, knowing what should run in your environment.
The ASD PDF is short, but ML3 delays usually come from manual operations. With the right model, six months is realistic.